Downloads

Material for designers, engineers and tender documents. Whatever is not here yet, we will send on request.

  • AERDOMA datasheet

    System scope, monitored points, control loops, the catalogue of 22 alarms, interfaces and archiving.

    In preparation

  • I/O schedule

    List of inputs and outputs with tags for a hall with one air handling unit and one court. The summary counts are on the How it works page.

    In preparation

  • Reference wiring diagram

    Block diagram of the switchboard with named points.

    In preparation

  • Sample tender wording

    Wording that describes the function without ruling out competitors.

    In preparation

Standards and requirements

We list only what we can commit to. Where verification is still ahead of us, it says so.

RequirementHow we meet it
Freely programmable controller to IEC 61131yes — we do not use configurable controllers running a manufacturer application
Metering for re-invoicingMID-certified electricity meter, per-phase measurement
Exposing parameters to a building management systemModbus TCP and BACnet IP
Archiving of measured dataSQL archive with defined intervals for every quantity
Accessibility of the operator applicationWCAG 2.1 AA
Electrical safety and switchboard inspectionSlovak Technical Inspectorate authorisations

The scope of the Technical Inspectorate authorisations and the list of standards we cite in tenders must be confirmed before publication.

Need something else?

If you are writing a specification and a particular wording or number is missing, write to us. The answer comes from the person building the system.

Write to us