Downloads
Material for designers, engineers and tender documents. Whatever is not here yet, we will send on request.
-
AERDOMA datasheet
System scope, monitored points, control loops, the catalogue of 22 alarms, interfaces and archiving.
In preparation
-
I/O schedule
List of inputs and outputs with tags for a hall with one air handling unit and one court. The summary counts are on the How it works page.
In preparation
-
Reference wiring diagram
Block diagram of the switchboard with named points.
In preparation
-
Sample tender wording
Wording that describes the function without ruling out competitors.
In preparation
Standards and requirements
We list only what we can commit to. Where verification is still ahead of us, it says so.
| Requirement | How we meet it |
|---|---|
| Freely programmable controller to IEC 61131 | yes — we do not use configurable controllers running a manufacturer application |
| Metering for re-invoicing | MID-certified electricity meter, per-phase measurement |
| Exposing parameters to a building management system | Modbus TCP and BACnet IP |
| Archiving of measured data | SQL archive with defined intervals for every quantity |
| Accessibility of the operator application | WCAG 2.1 AA |
| Electrical safety and switchboard inspection | Slovak Technical Inspectorate authorisations |
The scope of the Technical Inspectorate authorisations and the list of standards we cite in tenders must be confirmed before publication.
Need something else?
If you are writing a specification and a particular wording or number is missing, write to us. The answer comes from the person building the system.