What it costs

You will not find a price list here. You will find what the price is made of and what moves it — so you know what to ask when an offer arrives.

What the price is made of

The price depends on the number of air handling units, lighting sectors and on what is already in the switchboard. I am happy to give you a specific figure for your hall.

  • Switchboard and sensors

    One-off. The switchboard is our own product — we design it, build it and commission it. The price grows with the number of air handling units, lighting sectors and measured points.

  • Installation and commissioning

    One-off. Wiring the sensors, programming the controller, testing the safety branches including a simulated power cut, and training the operators.

  • Licence and operation

    Recurring. Cloud, bookings, tickets, archive and updates. The first year from handover of the hall is free of charge; after that the hall owner pays monthly. Hall control, alarms and the control room are never switched off over an unpaid fee. Without a connection the hall carries on to the last plan, but planning and booking happen in the cloud.

  • Service and remote support

    Optional. Remote access with a record of every intervention. Scope and response times are a matter of agreement, not of a package.

Who supplies what

AERDOMA is not a manufacturer of air-supported halls. It is an independent control and operations system that can be installed on a new hall as well as on an existing one.

The hall manufacturer supplies

  • the envelope and structure
  • fans and air handling
  • the heating unit
  • civil works
  • anchoring and structural design

AERDOMA supplies

  • the electrical switchboard
  • sensors and metering
  • the local control unit
  • safety and operating logic
  • lighting
  • the access system
  • bookings
  • the cloud application
  • energy and operating economics
  • reports
  • optional camera integration and AI analysis

The scope of supply is set after a technical assessment of the specific hall. We do not compete with the hall manufacturer — we complement them.

Why there is no figure here

We are not publishing a range yet. Until the first hall is handed over it would be a figure from a calculation, not from an invoice — and a figure that then moves by a third is worse than none. The price for your hall we give from its data sheet.

What one hour of court time costs

Tell us about the hall

From the hall data sheet and the available power we can say the scope of supply and the price. Nothing to prepare for the first conversation — how many courts you have and what you heat with is enough.

Assess my hall Documents

+421 907 762 373 Assess my hall